Basketball Manitoba is pleased to share a few new photos from inside the Sport Manitoba Canada Games Centre that is currently being constructed in downtown Winnipeg. The facility will sport 3 full FIBA sized hardwood basketball courts, 14 basketball hoops with square glass backboards (that can be set from 8-10 feet), scoreboards, shot clocks, a 40-foot ceiling, and upper level track, flex training spaces and more.
The hoops and clocks are now installed with the hardwood going down soon. The facility will be used this summer during the basketball portion of the 2017 Canada Games. The centre is expected to open early this summer.